SPECIAL INSPECTION
Special inspectors are third party licensed professional engineers and architects who oversee the construction and sign off of your project. Special inspection agencies are required to be hired by the owner, and are required for every single permitted project in New York City. We provide all levels of special inspection services from superstructure to fit out including structural steel, welding, concrete, masonry, and spray fireproofing, mechanical, energy, sprinkler, and firestopping. Read more
CIVIL
Concrete – Cast in Place
Masonry
Subgrade Inspection
Deep Foundation Elements
Helical Piles (BB # 2014-014)
Vertical Masonry Foundation Elements
Excavations-Sheeting, shoring and Bracing
Underpinning
Footing and Foundation
MECHANICAL
Smoke Control Systems
Mechanical Systems
Fuel Oil Storage and Fuel Oil Piping Systems
High-Pressure Steam Piping (Welding)
High Temperature Hot Water Piping (Welding)
High-Pressure Fuel-Gas Piping(Welding)
Seismic Isolation Systems
Energy Code Compliance Inspections
Public Assembly Emergency Lighting
Private On-Site Storm Water Drainage Disposal Systems and Detention Facilities Installation
Individual On-Site Private
Sewage Disposal
Systems Installation
Sprinkler Systems
Standpipe Systems
Heating Systems
Chimneys
Emergency and Standby Power Systems (Generators)
STRUCTURAL
Structural Steel – Welding
Structural Steel – Details
Structural Steel – High Strength Bolting
Structural Cold – Formed Steel
Wood – Installation of High-Load Diaphragms
Wood – Installation of Metal-Plate-Connected Trusses
Wood Installation of Prefabricated I-Joists
Wall Panels, Curtain Walls and Veneers
Sprayed fire-resistant materials
Mastic and Intumescent Fire-resistant Coatings
Exterior Insulation and Finish Systems (EIFS)
Alternative Materials – OTCR Buildings Bulletin
Structural Stability – Existing Buildings
Mechanical Demolition
Flood Zone Compliance
Post-installed Anchors (BB# 2014-012, 2014-013)
Structural Wood Frame
ARCHITECTURAL
Fire-resistant Penetrations and Joints
Luminous Egress Path Markings
Fire-Resistance Rated Construction
Final